Homepage Site Map Türkçe РУССКИЙ Deutsch Español العَرَبِيََّة
 
 
   
   
 

Heater
Automation
FPI
  TERMO ISI SİSTEMLERİ TİC. VE SAN. A.Ş. MERKEZ:Atatürk Cad. Samibey Sok. No:4 34843 Maltepe-İstanbul-Turkey Tel: 0216 442 93 00 Fax:0216 370 45 03
www.ecostar.com.tr
FABRİKA: Türkgücü Köyü Yolu Kurtdere Mevkii Çorlu-Tekirdağ-Turkey Tel: 0282 685 44 80 Fax:0282 685 42 09
SERVICE REQUEST FORM FOR COMMISSIONING
REQUEST THAT    
DEALER/SELLER: :
COMPANY OFFICER: :
PHONE :
FAX :
MOBILE PHONE NO: :
     
LAST USER    
COMPANY NAME: :
COMPANY OFFICER: :
PHONE: :
FAX :
MOBILE PHONE NO: :
ADDRESS: :
PRODUCT INFORMATION
BURNER TYPE:* :
BURNER FACTORY NO:* :
BOILER BRAND:* :
BOILER TYPE:* :
BOILER CAPACITY:* :
ASSIGNED SERVICE
COMPANY NAME: :
PERSON: :
PHONES: :
NOTE: :
BURNER FUEL TYPE
HEAVY OIL :
NO:4
NO:5
NO:6
LIGHT OIL :
LPG :
NATUREL GAS :
DUAL FUEL :
NO:4
NO:6
  :
Gaz-F.oil
Gaz-Motorin
ACCESSORIES THAT MUST BE IN THE SYSTEM AND TRANSACTIONS TO BE DONE
1- IF HEATING AND ONE STAGE BURNER (Cables off):
Boiler thermostat 1 Piece Boiler Safety Thermostat
                          
2- IF HEATING AND TWO STAGE BURNER (Cables off)
Boiler Thermostat 2 Pieces Boiler Safety Thermostat
                             
3- BURNER POWER CABLES WERE BROUGHT TO PANEL IN THREE-PHASE
4- FILTER WAS PLACED TO THE FUEL LINE FOR HEAVY OIL BURNERS/ THERE WAS ALREADY ONE
5- LT DAILY FUEL TANK WAS PLACED FOR HEAVY OIL BURNERS/ THERE WAS ALREADY ONE
 
6- ON THE DAILY PREHEATER:
THERE IS A THERMOMETER HEATER AND PANEL RELIEF PIPE
                                  
7- NON-RETURN VALVE WAS ASSEMBLED TO THE DAILY FUEL TANK/THERE WAS ALREADY ONE
 
8- REGULATOR BRAND BEFORE BURNER DIAMETER

GAS INLET PRESSURE FOR BURNER Mbar
 
9- GAS LINE WAS CONNECTED TO THE BURNER AND GAS LEAKAGE CONTROL WAS
DONE
 
10- CERTIFICATE HAS BEEN ON NATURAL GAS
 
11- LPG GAS WAS FILLED TO THE TANK, EVAPORATOR WAS RUN, FIRST STAGE REGULATOR WAS ARRANGED and mbar GAS WAS GIVEN TO SECOND STAGE REGULATOR. MAIN LINE LEAKAGE CONTROL WAS DONE.
 
 
ATTENTION:
AFTER YOU FAX THIS FORM TO TERMO ISI SISTEMLERI, YOUR BURNER WILL BE STARTED WITHIN 3 DAYS. IF ANY DEFICIENCY WAS DETECTED IN THE ITEMS STATED IN THE CONTROL LIST WHEN OUR AUTHIRIZED SERVICE COME, YOUR BURNER WILL NOT BE STARTED AND 55 EURO+VAT WILL BE CHARGED FOR SERVICE OCCUPATION FEE. CONTROL THE SYSTEM BEFORE REQUESTING FOR SERVICE.
 
Devreye Alma Formunun Pdf Dosyası İçin Tıklayınız
 
User name :
Password :
In-Site Search
Quick Search
E-catalogue.........................
Burner selection...................
Boiler Information................
Frequently asked questions..
Atatürk Caddesi
Sami Bey Sokak No:4
34843 Maltepe/İSTANBUL
Tel:90 216 442 9300 (pbx)
Fax:90 216 370 4503
All rights reserved by Termo Isı Sistemleri Ticaret ve Sanayi A.Ş. by3Nokta